Cass County 11528

Cass County 11528

New bridge 11528, on 23rd Ave SW, crosses over the South Fork Pine River and consists of a single-span prestressed concrete beam structure with a total length of 91 ft. The roadway clear width is 28 ft. The bridge has a reinforced concrete deck, concrete railing, and reinforced concrete abutments supported on driven steel piling.
Service Performed: Geotechnical and Utility Coordination, Preliminary/Final Bridge Design, Specifications, Cost Estimate, Load Rating.
Construction Completion Date: 2013.
Construction Cost: $410,929.