City of Fairmont 46574

City of Fairmont 46574

This new bridge on Lair Road crosses over Hall Lake Channel and consists of a 2-span continuous concrete slab structure with a total length of 82 ft. The bridge clear width is 36 ft. The bridge also includes a 6 ft wide sidewalk on each side of the roadway, a 12 ft wide trail underneath the bridge, and an 80 ft long concrete retaining wall extending from the northwest bridge corner. To improve aesthetics on the bridge, the abutments, wingwalls, pier cap, and railing were faced with a stone pattern concrete formliner. Ornamental railing and light standards were also installed on the bridge. Design also included steel sheet pile walls to improve navigation in the channel.
Service Performed: Hydraulics, Permit Applications, Geotechnical and Utility Coordination, Preliminary / Final Bridge Design, Specifications, Cost Estimate.
Construction Completion Date: 2013.
Construction Cost: $1,213,507.