Steele County 74555
This new bridge crosses over the Straight River on Summit Township Road 82, and consists of a 3-span prestressed concrete beam structure with a total length of 86 ft. The bridge clear width is 28 ft. The bridge superstructure is supported on integral concrete abutments and steel pile-bent piers. Design also included approximately 400 ft of approach roadway reconstruction.
Service Performed: Hydraulics, Permit Applications, Geotechnical and Utility Coordination, Preliminary / Final Bridge and Roadway Design, Specifications, Cost Estimate, Load Rating, Stool Heights.
Construction Completion Date: 2014.
Construction Cost: $382,114.