New Bridge 38532 on CSAH 6 crosses over the East Branch Baptism River and consists of a single span prestressed concrete beam structure with a total length of 70 ft. The bridge clear width is 36 ft. To improve aesthetics on the bridge, a structural tube steel railing was used and the abutments / wingwalls were faced with a stone pattern concrete formliner. The design also included 1000 ft of approach roadway reconstruction.
Service Performed: Field Survey, Hydraulics, Permit Applications, Geotechnical and Utility Coordination, Preliminary / Final Bridge Design, Preliminary / Final Roadway Design, Specifications, Cost Estimate.
Construction Completion Date: 2011.
Construction Cost: $746,475.