Wadena County Rehabilitation

Wadena County Rehab

Bridge 7170 crosses over the Crow Wing River on CSAH 12 and consists of a 3-span steel beam structure with a total length of 200 ft. The bridge has a reinforced concrete deck with a 30 ft clear width. The rehabilitation of this bridge included: concrete deck surface repairs (type A, C), scarify bridge deck, new concrete wear course, replace concrete railing & structural tube railing, repair and extend floor drains.
Service Performed: Bridge Inspection, Feasibility Study, Preliminary / Final Bridge Design / Plans, Specifications, Cost Estimate.
Construction Completion Date: 2012.
Construction Cost: $304,713.