This new bridge crosses over the Snake River and consists of a 3-span prestressed concrete beam structure with a total length of 276 ft. The roadway width is 40 ft. Full depth high performance concrete was used in the bridge deck in lieu of a low slump concrete overlay. To improve aesthetics on the bridge, a structural tube steel railing was used. The design included 800 ft of approach roadway reconstruction. Erickson Engineering also provided full-time construction inspection for this project. Services Performed:
Hydraulics, Permit Applications, Geotechnical and Utility Coordination, Preliminary / Final Bridge Design, Preliminary / Final Roadway Design, Specifications, Cost Estimate, Full-time Construction Inspection. Construction Completion Date: 2016. Construction Cost: $1,868,582.