St Louis County 69A55

St Louis County 69A55

This bridge crosses over a stream draining to Lake Kabetogama and consists of a single-span prestressed concrete beam structure with a total length of 50 ft. The roadway width is 32 ft. To improve aesthetics, the abutments and concrete railing were faced with a stone pattern formliner. The design also included structural tube railing, approach panels, 430 ft of roadway reconstruction, and a temporary bypass.
Services Performed: Hydraulics, Geotechnical and Utility Coordination, Preliminary and Final Bridge Design, Preliminary and Final Roadway Design, Temporary Bypass, Specifications, Cost Estimate,
Completion Date: 2017
Construction Cost: $515,615